Facility

Mast production takes place in our new 3000m² facility in Valencia, Spain and is strategically located on the Mediterranean Sea, close to one of Spain's most dynamic ports. This facility houses state of the art machinery including:

  • 50 meter x 1.5 meter Autoclave;
  • 60 meter climate controlled laminate paint booths;
  • 70 meter assembly and fit-out area;
  • 3000m² adjoining in-house rigging shop;
  • 50 meter, 100 ton in-house test bed;
  • Onsite offices, with connectivity, for external team use;
  • Machine shop with three full time machinists and includes a CNC milling machine, CNC lathe, manual lathes and polishing wheels;

Image Gallery